Open Net Zero logo
Implementation guide. Cost and Schedule Control Systems Criteria for Contract Performance Measurement
L o a d i n g
Organization
National Energy Technology Laboratory (NETL) - view all
Update frequencyunknown
Last updatedover 2 years ago
Format
Overview

This guide describes the DOE Cost and Schedule Control System Criteria (CSCSC) for Contract Performance Measurement and provides DOE and its contractors and other participants with uniform guidance for CSSCSC implementation in compliance with DOE Order 2250.1b. Implementation refers to the application of the CSCSC to specific contracts, the assessment of contractor's management control systems for compliance with the requirement, subsequent DOE systems validation or acceptance verifying the contractor's compliance, and systems surveillance to ensure continued compliance. Any supplemental instructions by individual DOE organizations will be consistent with the DOE Order and with this and other CSCSC guidance documents. A list of related DOE reference is provided in Attachment 2.

kmd
Additional Information
KeyValue
CitationRoy Long, Implementation guide. Cost and Schedule Control Systems Criteria for Contract Performance Measurement, 2016-09-29, https://edx.netl.doe.gov/dataset/implementation-guide-cost-and-schedule-control-systems-criteria-for-contract-performance-measureme
Netl Productyes
Poc EmailRoy.long@netl.doe.gov
Point Of ContactRoy Long
Program Or ProjectKMD
Publication Date1986-1-1
Share this Dataset
Trust Signals
Trust Framework(s)None
Assuranceunknown
Data Sensitivity Classunknown
Licenceunknown
Files