Open Net Zero logo
QUARTERLY REPORT - MARCH 1, 1982 THROUGH MAY 31, 1982 - EQUTY OIL COMPANY BX IN-SITU OIL SHALE PROJECT, PICEANCE BASIN, COLORADO
L o a d i n g
Organization
National Energy Technology Laboratory (NETL) - view all
Update frequencyunknown
Last updatedover 2 years ago
Format
Overview

"The following report has been organized into three sections as outlined below. Section A - Air Resources, contains a brief summary of work conducted during the last quarter, work planned for the next quarter and the results of the March 1982 field calibration report. Section B - Water Resources, includes a summary of work completed and planned, and an analysis of data collected during a field sampling trip conducted between March 7-11, 1982. Section C - Aquatic Biology, describes the work performed since the March 1982 Quarterly Report. Analyses of samples collected from the April field visit have not been completed and the results will be reported in the September Quarterly Report."

kmd
Additional Information
KeyValue
CitationRoy Long, QUARTERLY REPORT - MARCH 1, 1982 THROUGH MAY 31, 1982 - EQUTY OIL COMPANY BX IN-SITU OIL SHALE PROJECT, PICEANCE BASIN, COLORADO, 2016-09-29, https://edx.netl.doe.gov/dataset/quarterly-report-march-1-1982-through-may-31-1982-equty-oil-company-bx-in-situ-oil-shale-proj
Netl Productyes
Poc EmailRoy.long@netl.doe.gov
Point Of ContactRoy Long
Program Or ProjectKMD
Publication Date1982-6-10
Share this Dataset
Trust Signals
Trust Framework(s)None
Assuranceunknown
Data Sensitivity Classunknown
Licenceunknown
Files