Open Net Zero logo
Second-generation pressurized fluidized bed combustion plant: Phase 1, Task 2 topical report: Grimethorpe tube bundle E''wastage evaluation
L o a d i n g
Organization
National Energy Technology Laboratory (NETL) - view all
Update frequencyunknown
Last updatedover 2 years ago
Format
Overview

This report is the second part of a two-part topical report on Grimethorpe Tube Bundle E''Wastage Evaluation. Detail drawings, tube material certifications, spent bed and fuel/sorbent analyses, and field photographs make up this report. (JDL)

kmd
Additional Information
KeyValue
CitationKegel, W. ---- Roy Long, Second-generation pressurized fluidized bed combustion plant: Phase 1, Task 2 topical report: Grimethorpe tube bundle E''wastage evaluation, 2016-09-29, https://edx.netl.doe.gov/dataset/second-generation-pressurized-fluidized-bed-combustion-plant-phase-1-task-2-topical-report-grime
Netl Productyes
Poc EmailRoy.long@netl.doe.gov
Point Of ContactRoy Long
Program Or ProjectKMD
Publication Date1989-8-1
Share this Dataset
Trust Signals
Trust Framework(s)None
Assuranceunknown
Data Sensitivity Classunknown
Licenceunknown
Files
  • http://www.osti.gov/energycitations/product.biblio.jsp?osti_id=6990942