The following tasks are included in this project: Commercialization; Power plant development; Manufacturing facilities development; Test facility development; Stack research; and Advanced research and technology development. This report briefly describes the subtasks still to be completed: Power plant system test with reformed natural gas; Upgrading of existing, US government-owned, test facilities; and Advanced MCFC component research.

kmd
Additional Information
KeyValue
CitationRoy Long, Simulated coal gas MCFC power plant systems verification. Technical progress report, 2016-09-29, https://edx.netl.doe.gov/dataset/simulated-coal-gas-mcfc-power-plant-systems-verification-technical-progress-report
Netl Productyes
Poc EmailRoy.long@netl.doe.gov
Point Of ContactRoy Long
Program Or ProjectKMD
Publication Date1998-4-1
Share this Dataset
Trust Signals
Trust Framework(s)None
Assuranceunknown
Data Sensitivity Classunknown
Licenceunknown
Files
  • http://www.osti.gov/energycitations/product.biblio.jsp?osti_id=656643