USBM PILOT HOLE "X" HORSE DRAW, RIO BLANCO COUNTY, CO VOL. 1 SEC. II PERMEABLITY TESTING
L o a d i n g
Organization
National Energy Technology Laboratory (NETL) - view all
Update frequencyunknown
Last updatedover 2 years ago
Format
Overview

"Pilot Hole ""X"" was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine will be drilled. Five permeability tests were performed at various stratigraphic levels within this hole. The test method used was that of pumping fluids out of the hole for three hours, using the air lift method, followed by a three-hour period where the recharge was observed. Transmissivity and permeability results were determined from these test data. The test procedure used is described and supporting data for the hydrologic tests are provided."

kmd
Additional Information
KeyValue
CitationADRIAN BROWN AND WILLIAM HELEY ---- Roy Long, USBM PILOT HOLE "X" HORSE DRAW, RIO BLANCO COUNTY, CO VOL. 1 SEC. II PERMEABLITY TESTING, 2016-09-29, https://edx.netl.doe.gov/dataset/usbm-pilot-hole-x-horse-draw-rio-blanco-county-co-vol-1-sec-ii-permeablity-testing
Netl Productyes
Poc EmailRoy.long@netl.doe.gov
Point Of ContactRoy Long
Program Or ProjectKMD
Publication Date1977-3-1