The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which will be sited and operated in Phase 4. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown. This report summarizes work accomplished in 1Q97.
Utility advanced turbine systems (ATS) technology readiness testing and pre-commercial demonstration. Quarterly report, January 1--March 31, 1997
L o a d i n g
Organization
National Energy Technology Laboratory (NETL) - view all
Update frequencyunknown
Last updatedover 2 years ago
Format
Overviewkmd
Additional Information
KeyValue
CitationRoy Long, Utility advanced turbine systems (ATS) technology readiness testing and pre-commercial demonstration. Quarterly report, January 1--March 31, 1997, 2016-09-29, https://edx.netl.doe.gov/dataset/utility-advanced-turbine-systems-ats-technology-readiness-testing-and-pre-commercial-demonstratio
Netl Productyes
Poc EmailRoy.long@netl.doe.gov
Point Of ContactRoy Long
Program Or ProjectKMD
Publication Date1997-12-31